Power meter installation is an everyday thing for us, we are efficient at what we do, so you won’t have to wait long for your device !
Assembly times are respectively:
2-3 business days – one-sided power meter SINGLE (aluminum cranks)
2-4 business days – single-sided power meter SINGLE (carbon cranks) and double-sided power meter TWIN2
The assembly time is due to the technological process and there is no way to shorten it.